Opened commercial roof section exposing damaged plywood decking

Commercial roof replacement planned around your building and tenants.

Our commercial roof replacement crew in Patterson, CA tears off the old roof, fixes what is underneath and installs a new system.

Licensed, CSLB C39 #1134929InsuredFamily owned

When a commercial roof is past repair, we replace it with a written scope, we handle permits when required, and a crew that keeps you updated every day.

Long commercial metal roof panels and skylights

What it includes

A full tear-off and a new roof system, start to finish.

A replacement removes the old roofing down to the deck, replaces damaged decking and insulation, and installs a new single-ply, torch down or coated system. We rebuild flashings at walls, curbs and penetrations and make sure the drains and edges are set so water leaves the roof.

White-coated flat roof transition and vent piping

Why replace

When patches stop working, replacement is the lower risk.

If leaks keep returning, the insulation is wet, or the membrane is failing across the roof instead of in one spot, more repairs only delay the bill. A replacement resets the roof with new materials installed to the manufacturer’s requirements.

Corrugated commercial metal roof with translucent skylight panels

Where we work

Commercial replacements in the Central Valley and Bay Area.

We replace commercial roofs across Stanislaus, San Joaquin and Merced counties and take Bay Area projects. For general contractors, we fit our schedule into the larger build.

Heeler crew installing a Duro-Last PVC single-ply roof with parapet walls on a car wash in Atwater

When to plan it

Plan replacements for the dry season.

Rain limits tear-offs in November and December, so the best time to schedule is spring through fall. If you know a replacement is coming, an early walk of the roof gives you time to budget and plan around tenants.

Replacement scope

What goes into a commercial roof replacement.

01

Tear-off

Old membrane and wet insulation removed, with debris hauled off in our Equipter trailer.

02

Deck repair

Damaged decking found after tear-off is shown to you and priced before we replace it.

03

New system

A new single-ply, torch down or coated roof installed to the manufacturer’s requirements.

04

Details

New flashings at walls, curbs, pipes and edges, with drains and scuppers set to move water off.

How it works

No surprises from the walk to the walkthrough.

  1. 01

    Free estimate

    We walk the roof and explain what we find and what we recommend.

  2. 02

    Scope and deposit

    A clear written scope. A deposit covers materials.

  3. 03

    Permit and schedule

    We handle permits when required and plan the work around your building.

  4. 04

    Daily updates

    The crew tells your contact on arrival and before leaving what got done and what is next.

  5. 05

    Clean finish

    Debris goes in the Equipter trailer and the site is swept for nails.

  6. 06

    Final walkthrough

    You walk the finished roof with us, then final payment and the paperwork.

If we find rotted decking once the old roof is off, we tell you the price before we do it.

Why Heeler Roofing

Credentials on every replacement.

  • Licensed roofing contractor, CSLB C39 #1134929, and insured.
  • A written scope and estimate before any work starts, so you know what is included.
  • A family crew with more than 100 combined years in roofing, from estimate to final walkthrough.
  • Commercial roofs worked on Tesla, 7-Eleven and McDonald’s locations through general contractors.

Licensed, insured, family run.

CSLB C39 #1134929.
Free written estimates.

Daily updates from the crew, and our Equipter trailer keeps the job site clean.

Questions

Commercial roof replacement questions.

How do I know if my commercial roof needs replacing?
Repeated leaks in different spots, wet insulation, widespread blistering or a membrane that is shrinking and pulling at the edges are the usual signs. We walk the roof and tell you whether repair, a coating or replacement fits.
Can the building stay open during a replacement?
In most cases, yes. We stage materials and debris away from entrances, plan noisy work around your hours and keep your contact updated every day.
What is included in a commercial replacement estimate?
Tear-off or recover, insulation, the membrane or system, flashing, drains and cleanup, written out so you can compare it line by line.
Do you replace roofs for general contractors?
Yes. We regularly work under general contractors and fit our crew into the project schedule.

Free estimate

Tell us about your roof.

Call (209) 695-7663 or request a free estimate and we will get back to you quickly.